HUD 232 new construction for senior housing developers
A HUD Section 232 new construction loan finances a licensed assisted living facility, memory care building or nursing home of 20 or more beds from groundbreaking through a 40-year fixed-rate term, at up to 90% of cost. Few developers use it: HUD endorsed 34 new construction or substantial rehab loans on care facilities in fiscal 2021, 22 in 2022, 3 in 2023 then none in fiscal 2024 and one in 2025, by HUD’s endorsement database (data run July 8, 2026). The program is still available.
The terms
| New assisted living | New skilled nursing | |
|---|---|---|
| Loan to cost | 90% of total estimated replacement cost | 90% |
| Loan to value, for-profit / nonprofit | 75% / 80% | 80% / 85% |
| Minimum debt service coverage | 1.45 | 1.45 |
| Term | up to 40 years, fully amortizing, fixed | same |
| Mortgage insurance | 0.77% upfront and 0.77% a year; the lender pays the first year at initial closing | same |
| HUD inspection fee | 0.50% of the loan | same |
From HUD Handbook 4232.1 REV-1 (sections 2.6 and 3.2 to 3.4) and the Federal Register premium notice of June 26, 2025. Assisted living financed with low-income housing tax credits pays 0.45% a year. One loan covers construction and the permanent term when HUD insures advances during construction.
The equity HUD does not finance
Beyond the 10% of cost the loan does not cover, HUD requires four more cash commitments:
- A working capital escrow of 4% of the loan, “half of which will be a construction contingency for cost overruns and approved change orders” (2.6.K). It is released 12 months after final closing once the building has run six straight months at breakeven.
- An initial operating deficit escrow, sized to “the total of all cumulative monthly losses projected to occur until the project reaches breakeven operations” (Appendix 2.1), in cash or a letter of credit, released after three straight months at 1.45 coverage.
- Possibly a short-term debt service reserve of six to twelve months of principal, interest and premium where new units enter a market (2.5.NN).
- Completion assurance: 100% payment and performance bonds, or a cash or letter-of-credit deposit of 15% of construction cost for buildings up to three stories and 25% for elevator buildings of four or more (2.6.H).
With the calculator’s example inputs (100 units, 4 net move-ins a month from 15 at opening), the deficit escrow comes to about $2.7 million. The development calculator sizes it from your own absorption pace.
The other requirements
- Davis-Bacon prevailing wages apply to Section 232 construction by statute (12 U.S.C. 1715c), with weekly certified payroll.
- Nursing beds need a certificate of need where the state has one; HUD will not proceed without it (2.5.EE). See the state table.
- The operator needs “at least three years of experience successfully operating multiple projects with the types of beds proposed” (2.5.FF).
- Substantial rehabilitation now means hard costs above 25% of the value after completion (Mortgagee Letter 2025-20, September 16, 2025), up from 15%.
Why most developers build with a bank loan instead
A bank construction loan avoids HUD’s Davis-Bacon requirement and HUD’s queue, and the building can refinance into a HUD 232/223(f) loan once it has been open three years. That route gives up HUD’s 40-year fixed rate during construction and lease-up, and adds refinance risk, and HUD’s construction volume suggests most developers take it.
Questions people ask
What is the maximum loan on a HUD 232 new construction project?
The lowest of 90% of total estimated replacement cost, the loan-to-value limit (75% for new assisted living and 80% for skilled nursing for a for-profit borrower, 80% and 85% for a qualifying nonprofit), and what NOI supports at 1.45 coverage with mortgage insurance counted.
How long is a HUD 232 construction loan?
Up to 40 years or three quarters of the building's remaining economic life, whichever is less, fixed rate and fully amortizing, under HUD Handbook 4232.1, 2.6.D.